Application Transition Methodology

$
0
0

This blog describes about the application transistion methodology process. This information will be very useful while you are performing application transisition. Also, it will be easy to understand different types of phases and usages.

 

 

Application Transistion Methodlogy.jpg

 

 

Different phases and Status:

 

  • Planning Phase
  • Guided Perform Phase
  • Assisted Perform Phase
  • Parallel Perform Phase
  • Steady State

 

Application Transistion Methodlogy 1.jpg

 

 

Application Specific Planning Phase:

 

Specific Planning Phase.jpg

 

 

Risks / Issues :

 

Are there any outstanding critical risks or issues for this application:


Status:

 

Evaluation of Training During The Guided Perform Phase :

 

  • Planned application training has been completed at this stage
  • Planned tool training has been completed, if any appropriate at this stage
  • Draft Application Information Document (AID) sent to SME's for review (Completeness & Accuracy of the content of the respective sections in the document)
  • OverallGuided Perform Skill Level
  • Technical Infrastructure
  • Mentees have application connectivity and security required to perform work
  • Mentees have application access required to perform work (To be completed by SME/AM lead only)

Guided Perform Phase.jpg

 

 

Evaluation of work performed during the Assisted Perform Phase:

 

  • Ability to perform assigned tasks (i.e. Enhancement/ Work Request,Production tickets,Adhoc user requests) or analysis scenarios with assistance from SMEs
  • Mentee team has knowledge about the Problem Ticket & Change Management process for Production support
  • Updated Application Information Document (AID) sent to SME's for review (Completeness & Accuracy of the content of the respective sections in the document)
  • Draft Application Support Control Plan (ASCP) sent to SME's for review (Completeness & Accuracy of the content of the respective sections in the document)
  • OverallAssisted Perform Skill Level (To be completed by SME/AM lead only)

Assisted Perform Phase.jpg

 

Evaluation of work performed during the Parallel Perform Phase :

  • Ability to perform assigned tasks (i.e. Enhancement/ Work Request,Production tickets,Adhoc user requests) or analysis scenarios with limited assistance from SMEs
  • Final Application Information Document (AID) reviewed (Completeness & Accuracy of the content of the respective sections in the document) by SME's and baselined
  • Final Application Support Control Plan (ASCP) reviewed (Completeness & Accuracy of the content of the respective sections in the document) by SME's and baselined
  • Overall Parallel Perform Skill Level (To be completed by SME/AM lead only)

 

Parallel Perform Phase.jpg

 

Submodule ready to move to Steady State Support:

 

Steady State.jpg

 

Application Knowledge Acceptance: Various Skill Level and Status mentioned below:

Application Knowledge Acceptance.jpg

Transistion Schedule:

Transition Schedule.jpg